Lyndale Colvannick, Four Winds, Bodmin, PL30 4HJ

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Mixed signals - investigate
Verdict
Derived from HomePortfolio scores
Lyndale Colvannick earns an INVESTIGATE rating with HP Score 55/100. Investment score 54/100 reflects moderate fundamentals. Crime intensity is very low. Walkability is limited (0/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Tenure is freehold. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceLow
- RadonModerate
- MiningModerate
- LandslideLow
- Air QualityLow
- NoiseLow
Planning Activity
- ApprovedPA26/05484Non material amendment in relation to decision notice PA24/07019 dated 11/11/2024 to allow Upper House - Reduction in the overall footprint of the dwelling. Replacement of the approved enclosed garage with an open-sided carport. Revision to the external wall materials, replacing the approved natural timber cladding with corrugated fibre-cement sheeting to the upper storey and replacing the approved granite walling with silicone render to the lower storey. Lower House - Revision to the garage roof from a flat roof to a mono-pitch roof. Revision to the extent and specification of the external garage cladding. Revision to the foyer roof finish to a single-ply membrane incorporating a rooflight. Upper and Lower Houses - Minor repositioning and resizing of windows to both dwellings, including the removal, relocation and reduction in size of selected windows, as shown on the amended drawings
- ApprovedPA26/02723Prior approval for change of use of barn to 8 residential units including building operations necessary for the conversion
- ApprovedPA26/01496National Grid are proposing to upgrade an existing overhead line between poles 43H85 to 43HJ15 and 43HJ15 to 43HJA5 near Penlan Services, Four Winds, Bodmin, Cornwall, PL30 4HH and as per the plans attached. These works are necessary to make the electricity network 3 phase compatible which will provide customers with 3 phase connection to our distribution network. The overhead line route is approximately 1.7 kilometres in length and the main scope of the works will be to install a 3rd wire with the necessary additional fixtures and fittings to support the new line. The new line will attach to insulators on the cross arms of the existing poles and will be in between the two existing outer wires meaning that the visual impact of this additional 3rd wire is considered very minimal. This section of line was refurbished several years ago so it is anticipated that most of the poles will not require any changes however our team will inspect each pole before works commence and if any poles are identified to require replacement this will be done on a like for like basis with the landowners consent and ensuring the old apparatus is dismantled and removed from site. On pole 43HJ15 it will require an out of balance stay to be added to it, this is to keep the pole upright and balanced once the additional wire is installed. I have attached a street view plan showing the works area extents and a network plan showing the line to be included in these works all highlighted yellow
Ownership
- Corporate Ownership74.5%
- Overseas OwnershipNo
- Lease Term Remaining-
- CovenantsRestrictive
- Lease TypeFreehold
- Last Ownership Change-
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- Blisland Primary Academy1.3 miGood
- Cardinham School1.4 miGood
- -Callywith College3.4 mi
- St Breward Community Primary School3.9 miArea grades2025
Inspected after Ofsted withdrew the single overall grade.
1 of 12 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.
Comparables
- Poundsconce-£220k-
- Stokely Farm-£490k-
- Colvannick-£240k-
- Lyndhurst-£137k-