15 Chapel Farm Mobile Home Park, Guildford Road, Normandy, Guildford, GU3 2BB

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Mixed signals - investigate
Verdict
Derived from HomePortfolio scores
15 Chapel Farm Mobile Home Park earns an INVESTIGATE rating with HP Score 60/100. Investment score 54/100 reflects moderate fundamentals. Crime intensity is very low. Walkability is limited (1/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceLow
- RadonLow
- MiningUnknown
- LandslideLow
- Air QualityLow
- NoiseLow
Planning Activity
- Pending25/D/00050/2Discharge of condition 2 (Trees), 3 (Ecology Report), 5 (Scheme for Vehicles to Park and Turn), 7 (Scheme Bicycles and e-bikes) and 8 (Contaminated Land) of planning application 23/W/00055, approved 28/03/2024
- Approved26/D/00101Discharge of Conditions 3 (external materials), 4 (external joinery), 5 (paint removal) and 6 (rainwater goods) of Listed Building Consent 23/P/01896 approved 30/9/2024.
- Approved26/P/00795Listed Building Consent for consolidation and recoating of existing KEIM mineral paint to masonry and brickwork infills in lieu of limewash; removal of black paint to the exposed timber frame and replacement with a translucent breathable oil-based paint in lieu of limewash; installation of a perimeter French drain around the base of the main house; rebedding of chimney parapet copings over creasing tiles on the east elevation; installation of concealed tile vents to the inner roof slopes; and replacement of existing eaves mesh with a finer insect mesh following wall head repairs. Internally: removal of all cementitious render and gypsum plaster from external walls and replacement with a breathable diathonite parge coat, wood fibre board insulation and lime plaster finish; extension of ground floor slab replacement works to include the NE ground floor room (with historic panelling and stair retained in situ); substitution of a conventional concrete slab with damp proof membrane for the previously approved breathable foamed glass aggregate slab; and loose-laying of 300mm mineral wool insulation in the loft space.
Ownership
- Corporate Ownership55.9%
- Overseas OwnershipNo
- Lease Term Remaining-
- CovenantsNone
- Lease Type-
- Last Ownership Change-
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- Normandy Village School1.3 mi
Inspected as Wyke Primary Academy (URN 145543) on 27 Sep 2022
- Wood Street Infant School and Nursery1.4 mi
Inspected as Wood Street Infant School (URN 125004) on 28 Jan 2025
- Worplesdon Primary School1.6 mi
Inspected as Worplesdon Primary School (URN 125025) on 29 Apr 2025
- Guildford Grove Primary School2.2 miGood
4 of 11 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.