Rivers End, Coggeshall Road, Bradwell, Braintree, CM77 8ED

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Mixed signals - investigate
Verdict
Derived from HomePortfolio scores
Rivers End earns an INVESTIGATE rating with HP Score 65/100. Investment score 54/100 reflects moderate fundamentals. Crime intensity is low. Walkability is limited (35/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Tenure is freehold. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceSignificant
- RadonLow
- MiningUnknown
- LandslideLow
- Air QualityLow
- NoiseModerate
Planning Activity
- ConditionsESS/12/20/BTE/45/03Details pursuant to condition 45 (Completion of archaeological field work – Phase 4 north and part of phase 5 ) of ESS/12/20/BTE. ESS/12/20/BTE was for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).”
- PendingESS/12/20/BTE/62/01Details pursuant to condition 62 (Aftercare scheme for biodiversity) of ESS/12/20/BTE. ESS/12/20/BTE was for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).”
- PendingESS/12/20/BTE/36/01Details pursuant to condition 36 (Landscape Ecological Management Plan) of ESS/12/20/BTE. ESS/12/20/BTE was for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).”
Ownership
- Corporate Ownership60.4%
- Overseas OwnershipNo
- Lease Term Remaining-
- CovenantsRestrictive
- Lease TypeFreehold
- Last Ownership Change2017-10-06
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- Stisted Church of England Primary Academy1.2 miOutstanding
- Beckers Green Primary School1.8 miGood
- Lyons Hall School1.9 miGood
- Alec Hunter Academy2.1 miGood
4 of 13 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.
Comparables
- 113 Coggeshall Road-£349k-
- The Cottage Coggeshall Road-£342k-
- 114 Coggeshall Road-£360k-
- 113 Coggeshall Road-£235k-