Flat 313, 93 Princess Road, Manchester, M14 4BR

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Strong fundamentals; flood risk not assessed
Verdict
Derived from HomePortfolio scores
Flat 313 earns an INVESTIGATE rating with HP Score 77/100. Investment score 68/100 reflects moderate fundamentals. Walkability is good (81/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceLow
- RadonLow
- MiningUnknown
- LandslideLow
- Air QualityLow
- NoiseModerate
Planning Activity
- PendingOTH-2026-002028T1 london plane only tree in front garden Pic supplied tree works required is to pollard or reduce back to previous the tree is overdue a reduction and a london plane producing a lot of spores due to size causing breathing problems and casting on vehicles within houses and making tenants feel unwell the size of it along with leaves make it very dark especially with other trees in same location.
- PendingOTH-2026-002131Discharge of Condition 13 (Highways Works) attached to planning permission 143777/FO/2025.
- PendingPLA-2026-001875Change of Use to basement and ground floor pharmacy with two, two-bedroom apartments involving part single, part two-storey rear extension and elevational alterations, laying out of car parking space with bin store, cycle store, hard landscaping, boundary treatment and external plant and equipment.
Ownership
- Corporate Ownership67.5%
- Overseas OwnershipNo
- Lease Term Remaining243 yrs
- CovenantsNone
- Lease Type-
- Last Ownership Change-
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- IncludEd Learning0.3 miGood
- St Mary's CofE Junior and Infant School0.3 miOutstanding
- Holy Name Roman Catholic Primary School Manchester0.4 miOutstanding
- Webster Primary School0.4 miArea grades2025
Inspected after Ofsted withdrew the single overall grade.
2 of 9 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.