Apartment 3, Bamboo House, 11 Market Street, Newbury, RG14 5LX

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Mixed signals - investigate
Verdict
Derived from HomePortfolio scores
Apartment 3 earns an INVESTIGATE rating with HP Score 74/100. Investment score 68/100 reflects moderate fundamentals. Crime intensity is moderate. Walkability is good (83/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceModerate
- RadonLow
- MiningModerate
- LandslideLow
- Air QualityLow
- NoiseModerate
Planning Activity
- Pending26/02545/TPCThere are four trees growing on the offside of the Kennet & Avon canal in Newbury. The trees form the boundary screening between the canal and the neighbouring block of flats. The neighbours are complaining that branches from the trees are overhanging the boundary and have reached their windows, where they will tap during windy weather causing a nuisance. The Canal & River Trust have agreed to undertake siding work to remove the lower branches from the four trees causing a nuisance, stopping the branches from tapping on the windows. Please see attached marked up photos for an indication of the work required. The site has been visited by our approved tree management contractors, Ground Control. The trees to be affected comprise; 3 Acer sp. and a small fruit tree. Approximately 10 branches will be removed, cleanly cut back to the trunk, all on the flat side of the boundary.
- Pending26/02507/CERTPApplication for a Lawful Development Certificate for a Proposed Use or Development: Works to 224 meters of walking, wheeling and cycling path through Faraday Road Park, by agreement with West Berkshire District Council as landowner. The following works are proposed: Replace an existing 77m section of block paved path from the Millenium Milepost to the Football Club Car Park, with a sealed surface path and widen to maximum 3m (or as wide as physical constraints allow). Construct a 147m stretch of new 3m wide sealed surface path from the eastern extent of the block paved path to the existing footbridge south of the football ground. Resurface the path with construction techniques including no dig around root protection zones (to protect mature trees when the route passes through the RPA). This is indicated on the submitted block plan and will be further investigated to ensure flood risk is not exacerbated in line with the requirements of a Flood Risk Activity Permit (FRAP) (a bespoke permit is likely to be required). Install benches and bike parking at appropriate locations along the route. Provide updated wayfinding and signage
- Pending26/02522/TPWT1 - Horse Chestnut - Low hanging branches overhanging access road and footpath. - Tip lift branches overhanging access road and footpath to 3m. T2 - Horse Chestnut - Previously monolithed. Abundance of epicormic growth across whole tree, including base preventing full inspection. - Remove all epicormic growth. T3 - Horse Chestnut - Stump from previously felled tree. - Grind stump and replant area with horse chestnut to maintain area aesthetic. T4 - Horse Chestnut - Low hanging branches overhanging access road. - Tip lift overhanging branches to 3m.
Ownership
- Corporate Ownership54.1%
- Overseas OwnershipNo
- Lease Term Remaining999+ yrs
- CovenantsNone
- Lease Type-
- Last Ownership Change-
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- St Nicolas C.E. Junior School0.2 miArea grades2024
Inspected after Ofsted withdrew the single overall grade.
- Northcroft Vocational School0.2 miReport card2026
Ofsted no longer awards a single overall grade.
- Victoria Park Nursery School0.4 miReport card2026
Ofsted no longer awards a single overall grade.
- St John the Evangelist CofE Infant and Nursery School0.6 miArea grades2025
Inspected after Ofsted withdrew the single overall grade.
4 of 10 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.