292 Coombe Lane, London, SW20 0RW

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Mixed signals - investigate
Verdict
Derived from HomePortfolio scores
292 Coombe Lane earns an INVESTIGATE rating with HP Score 65/100. Investment score 53/100 reflects moderate fundamentals. Crime intensity is very low. Walkability is limited (6/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Tenure is freehold. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceSignificant
- RadonLow
- MiningUnknown
- LandslideLow
- Air QualityLow
- NoiseModerate
Planning Activity
- Pending26/02356/TPOT1; Robinia - Remove deadwood and reduce the two lowest limbs growing over the garden from 5 m to 3 m each. T2: Birch - Reduce the height by 1.5m, returning to the previous pruning points, and reduce the sides to match. Remove deadwood, crossing branches and trunk suckers. T3: Robinia - 2m Crown reduction to previous pruning points, remove deadwood, crossing branches and trunk suckers. T4: Poplar: Reduce the crown to the previous pruning points at the level of the observed hollow, reducing the height by 8m, remove deadwood. T5: Oak - Selectively lift the crown by removing approximately three lower limbs. Overall height remains the same. T6: Ash - Reduce the crown to the previous pruning points, reducing the height by 2.5m, remove deadwood, crossing branches and trunk suckers. T7: Ash - Reduce the crown to the previous pruning points, reducing the height by 2m. Remove deadwood, crossing branches and trunk suckers. T8: Oak - Reduce the crown to the previous pruning points, reducing the height by 2m. Remove deadwood, crossing branches and trunk suckers.
- Pending26/02261/CLCDetails required for Condition 17 (SuDs Evidence) of planning permission 24/01796/FUL (Demolition of single dwelling and erection of six dwellings together with associated works.)
- Pending26/02126/CPUInstallation of 8nos. Electric Vehicle Charging Bays and Substation Works include the installation of EV charging posts, a substation, associated electrical works and cabling, as well as improved paving and line marking. All works are located within the existing car park.
Ownership
- Corporate Ownership55.4%
- Overseas OwnershipNo
- Lease Term Remaining-
- CovenantsRestrictive
- Lease TypeFreehold
- Last Ownership Change-
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- St Matthew's CofE Primary School0.1 miGood
- Inspected by ISIThe Rowans School0.5 mi
- Hollymount School0.7 miGood
- West Wimbledon Primary School0.7 miReport card2026
Ofsted no longer awards a single overall grade.
3 of 9 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.
Comparables
- 258A Coombe Lane-£1.95M-
- 258B Coombe Lane-£1.92M-
- 288 Coombe Lane-£1.63M-
- 288 Coombe Lane-£780k-