171B Surbiton Hill Park, Surbiton, KT5 8EL

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Strong fundamentals; flood risk not assessed
Verdict
Derived from HomePortfolio scores
171B Surbiton Hill Park earns an INVESTIGATE rating with HP Score 87/100. Investment score 81/100 reflects strong fundamentals. Crime intensity is very low. Walkability is excellent (85/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Tenure is leasehold. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceSignificant
- RadonLow
- MiningUnknown
- LandslideLow
- Air QualityLow
- NoiseModerate
Planning Activity
- Pending26/02235/TPOThe proposal is to replace approximately 8 m of damaged existing surface water drainage pipe within the grounds of Berrylands Scout Group. The pipe is on its existing alignment and conveys surface water towards an outfall to Surbiton Stream. Its failure restores no positive fall to the outfall, which contributes to recurring flooding of the site. The pipe is being relaid like-for-like to restore positive fall and function, and no change to the pipe?s capacity or the site?s impermeable area is proposed. Works within the Root Protection Area Part of the pipe lies within the Root Protection Area (RPA) of an Oak (T20) protected by a Tree Preservation Order (ref. RBK.04.87). No felling, pruning or other work to the tree is proposed. The works within the RPA will be carried out as follows, as shown on Tree Protection Plan 25015-WCS-XX-ZZ-DR-C-0004: Hand-dug or air-spade trial holes along the pipe route to establish the extent, depth and diameter of roots before installation. Excavation by hand to BS 5837:2012 (Section 7.2), retaining all roots over 25 mm diameter. No root over 25 mm will be cut without prior agreement from the arboriculturist. Mechanical excavation limited to breaking out the existing hard surface (approx. 100 mm depth), under the arboriculturist?s direct instruction. Protective Heras fencing (braced) and ground protection sheets for the duration of the works. Reinstatement of the existing hard surfacing like-for-like once the pipe is installed. All arisings removed from site and the site left as found. All works within the RPA, including trial holes, excavation, pipe installation and reinstatement of the hard surfacing, will be supervised on site by a qualified arboriculturist.
- Pending26/02127/CPUDemolition of an existing boundary wall and erection of a new boundary wall with associated landscaping
- Pending26/02100/CPUErection of hip-to-gable and rear dormer roof extension with front rooflights to facilitate loft conversion. Alterations to roof of existing ground floor rear extension from flat to pitched with rooflights. Erection of a single storey detached outbuilding within the rear garden curtilage for incidental residential use.
Ownership
- Corporate Ownership73.5%
- Overseas OwnershipNo
- Lease Term Remaining168 yrs
- CovenantsRestrictive
- Lease TypeLeasehold
- Last Ownership Change2012-06-01
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- Christ Church CofE Primary School0.4 miGood
- The Hollyfield School and Sixth Form Centre0.6 mi
Inspected as The Hollyfield School and Sixth Form Centre (URN 102600) on 11 May 2011
- King's Oak Primary School0.6 miGood
- King Athelstan Primary School0.7 miGood
2 of 11 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.
Comparables
- 171 Surbiton Hill Park-£365k-
- 173A Surbiton Hill Park-£390k-
- 173A Surbiton Hill Park-£323k-
- 171 Surbiton Hill Park-£349k-