Flat 11, Printers Inn Court, 14 Cursitor Street, London, EC4A 1LR

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Mixed signals - investigate
Verdict
Derived from HomePortfolio scores
Flat 11 earns an INVESTIGATE rating with HP Score 63/100. Investment score 61/100 reflects moderate fundamentals. Crime intensity is elevated. Walkability is excellent (99/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceSignificant
- RadonLow
- MiningUnknown
- LandslideLow
- Air QualityLow
- NoiseModerate
Planning Activity
- Pending2026/4894/T(TPO REF: A2) REAR GARDEN AREA: 1 x Lime (Tilia cordata) (T28) - Lift low canopy to 4m over adjacent driveway/parking area. 1 x Tree of Heaven (Ailanthus altissima) (T29) - Pollard to previous pollard height and back to the most recent, previous pollard points, removing around 7m of extended regrowth. 1 x London Plane (Platanus x hispanica) (T37) - Prune from adjacent structure to clear building roof to the northwest by 2m.
- Pending26/01629/MDCSubmission of Site Condition Survey pursuant to condition 3 of planning permission 25/01062/FULL dated 17.07.2026.
- Pending26/01618/MDCSubmission of Assessment of Impact of Redevelopment on Central Line Tunnels, Tunnel Condition Survey and Piling Design Information pursuant to condition 47, 48 and 49 of planning permission 25/00970/FULMAJ dated 18.06.2026.
Ownership
- Corporate Ownership18.2%
- Overseas OwnershipNo
- Lease Term Remaining-
- CovenantsNone
- Lease Type-
- Last Ownership Change-
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- Inspected by ISICity Junior School0.1 mi
- -University of the Arts London0.2 mi
- St Alban's Church of England Primary School0.2 miGoodImproving
- -London School of Economics and Political Science0.3 mi
2 of 5 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.