14 Rothesay Close, St. Helens, WA11 9QT

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Mixed signals - investigate
Verdict
Derived from HomePortfolio scores
14 Rothesay Close earns an INVESTIGATE rating with HP Score 74/100. Investment score 67/100 reflects moderate fundamentals. Crime intensity is low. Walkability is limited (53/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Tenure is leasehold. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceLow
- RadonModerate
- MiningUnknown
- LandslideLow
- Air QualityLow
- NoiseLow
Planning Activity
- ApprovedA/2026/0033/NMANon-material amendment to application P/2026/0046/HHFP, to include additional window on one side and change from window to door at other side.
- PendingP/2026/0402/HHFPPart two storey, part single storey side extension.
- PendingP/2026/0393/S73Section 73 application to vary conditions 2 (Approved Plans), 3 (Off-Site Highway Works and Sustainable Transport Improvements), 4 (Biodiversity Net Gain Monitoring Scheme), 7 (Closure of Existing Accesses and Footway Upgrades), 8 (Laffak Road Bridge Shuttle Traffic Signal Scheme), 11 (Tree Works), 12 (Demolition Phase Tree Protection Measures), 13 (Construction Phase Tree Protection Measures), 20 (Land Contamination Investigation and Remediation), 21 (Remediation), 22 (Coal Mining Intrusive Site Investigations and Remediation), 23 (Coal Mining Verification), 24 (Construction Environmental Management Plan (CEMP)), 25 (Foul and Surface Water Drainage Scheme), 36 (RAMS Method Statement), 40 (Engineering Details for Laffak Road Realignment), 44 (Construction Phase Local Employment Scheme), 46 (Energy and Sustainability Statement), 49 (Reserved Matters Submission), 50 (Approval of Reserved Matters), 58 (Landscaping Scheme), 59 (Arboricultural Method Statement), 61 (Landscape and Ecological Management Plan), 62 (Habitat Management and Monitoring Plan), 63 (Habitat Creation and Enhancement Works), 64 (External Materials), 65 (Noise Assessments), 66 (Outline Development Construction Phase Local Employment Scheme), 67 (Outline Development Operational Phase Local Employment Scheme), 68 (Detailed Drainage Scheme), 70 (Servicing, Waste Collection and Delivery Strategy), 71 (Travel Plan), 72 (Phase II Site Investigation and Risk Assessment), 73 (Coal Mining Risk Assessment), 74 (Coal Mining Site Investigations and Remediation), 75 (Renewable and Low Carbon Energy Statement), 76 (Invasive Species Method Statement), 77 (Construction Environmental Management Plan), 78 (Open Space Strategy (Care Home Phase)), 79 (Bin Storage Details), and 80 (Bird and Bat Boxes) of planning permission P/2025/0194/FUL to permit demolition works prior to the discharge of specified pre-commencement conditions.
Ownership
- Corporate Ownership58.9%
- Overseas OwnershipNo
- Lease Term Remaining999+ yrs
- CovenantsRestrictive
- Lease TypeLeasehold
- Last Ownership Change2023-12-20
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- Ashurst Primary School0.1 miReport card2026
Ofsted no longer awards a single overall grade.
- St. Mary's Blackbrook Catholic Primary School0.3 miGood
- St Augustine of Canterbury Catholic Academy0.6 miArea grades2024
Inspected after Ofsted withdrew the single overall grade.
- St Peter and St Paul Catholic Primary School0.6 miArea grades2024
Inspected after Ofsted withdrew the single overall grade.
2 of 10 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.
Comparables
- 13 Rothesay Close-£105k-
- 12 Rothesay Close-£185k-
- 14 Rothesay Close-£130k-
- 12 Rothesay Close-£131k-