Flat 303, 7 High Holborn, London, WC1V 6DR

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Mixed signals - investigate
Verdict
Derived from HomePortfolio scores
Flat 303 earns an INVESTIGATE rating; it has no HP Score yet. Walkability is excellent (99/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Tenure is leasehold. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceUnknown
- RadonUnknown
- MiningUnknown
- LandslideUnknown
- Air QualityUnknown
- NoiseUnknown
Planning Activity
- Pending26/3337/KChange of use of part basement floor, part ground floor, and upper floors from offices (Class E) to visitor accommodation (Class C1), demolition of the 4th and 5th floors to allow the erection of a three-storey extension at roof level with rooftop terrace, alterations to existing facade and retail frontage, and other associated works.
- Pending2026/5046/PNon-material amendments to planning permission 2024/2732/P (subsequently amended by non-material amendments application 2025/5522/P) which granted planning permission for: 'Refurbishment and extension of the existing building to provide additional commercial, business and service use (Class E) including nine storey front extension, replacement of roof extension and introduction of a rooftop terrace, provision of separate cafe unit (Class E), and elevational alterations and external works to NAMELY: replace black granite cladding on the north façade central bay with limestone; and (flanking bays) replace metal cladding with natural silver anodised aluminium, omit two windows and internal alterations, incl, re-positioned service doors
- Pending26/07746/OBSConversion and refurbishment of the cafe/bar (former Clerks' Office) to provide new dining room including opening up of existing windows onto new terrace within northern lightwell at upper ground floor level. Reconfiguration of lower ground floor to provide supporting kitchen / changing facilities / office accommodation and plant room. New lift shaft connecting lower ground floor kitchen with upper ground and mezzanine floors. Extension within North lightwell at lower ground floor to provide supporting WCs and storage. New rooflight at roof level / vertical glazing to enclose northern lightwell. General refurbishment of perimeter walls of north lightwell including decorative recladding of existing North Lightwell. New vertical circulation block including riser and roof mounted plant enclosure within southern lightwell. New ventilation flue to roof level integrated with existing boiler chimney. Refurbishment of the Gallery Suite room. New photovoltaic and chiller plant installations at roof level. Decarbonisation of building.
Ownership
- Corporate Ownership-
- Overseas OwnershipNo
- Lease Term Remaining-
- CovenantsRestrictive
- Lease TypeLeasehold
- Last Ownership Change2001-11-16
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- Inspected by ISICity Junior School0.0 mi
- St Alban's Church of England Primary School0.1 miGoodImproving
- -University of the Arts London0.1 mi
- Christopher Hatton Primary School0.3 miReport card2026
Ofsted no longer awards a single overall grade.
2 of 5 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.
Comparables
- 7 High Holborn-£763k-
- 7 High Holborn-£715k-
- 7 High Holborn-£1.20M-
- 7 High Holborn-£500k-