Flat 6, 2 Morwell Street, London, WC1B 3BT
UPRN:5203124-Beds -Built -
Tenure: -Council Tax: Band HEPC: -
Data freshness:Listing· freshListing: fresh, refreshed 4d ago (2026-11-06T04:00:06.530844+00:00)Ownership· 1mo agoOwnership: ageing, refreshed 1mo ago (2026-10-10T19:07:10.048392+00:00)Risk· 5mo agoRisk: stale, refreshed 5mo ago (2026-06-18T00:00:00+00:00)Connectivity· 1mo agoConnectivity: ageing, refreshed 1mo ago (2026-10-03T06:43:10.905825+00:00)Schools· 1mo agoSchools: ageing, refreshed 1mo ago (2026-10-06T08:24:30.427161+00:00)Amenities· 2mo agoAmenities: ageing, refreshed 2mo ago (2026-09-23T00:00:00+00:00)Area· Census 2021Area: static reference data (Census 2021); authoritative and does not refresh

HP Score
47
/ 100
Mixed
Verdict
3 days ago
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Mixed signals - investigate
Evidence
10 of 21 sourcesSale Estimate
--
-- - --
Rent Estimate (pcm)
--
-- - --
Verdict
Derived from HomePortfolio scores
Flat 6 earns an INVESTIGATE rating with HP Score 47/100. Crime intensity is elevated. Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Key SourcesPortal listingsDefra strategic noise mapping, England Round 4 (Contains Defra data © Crown copyright and database right 2023-2024, Open Government Licence v3.0)ONS Census 2021Police.ukPlanIt / council planning portalsOverture Maps PlacesOfsted / DfE GIAS
47
HP Score
47/ 100
Mixed
-
Investment Score
No data
100
Crime Score
100/ 100
Elevated
-
Walkability
No data
Transit & Bike
No data
Valuation & Market
Sale Estimate-
Rent Estimate (pcm)-
Gross Yield-
1y Growth-
3y Growth-12.6%
5y Growth-6.5%
10y Growth-2.0%
Last Sold Price-
Risk Overview
- Flood RiskUnknown
- SubsidenceSignificant
- RadonLow
- MiningUnknown
- LandslideLow
- Air QualityLow
- NoiseModerate
Planning Activity
Recent Apps
-WC1B 3BT
Approval Rate
-12mo
Development
-
- Pending2026/4891/T(TPO REF: A3) IN SQUARE GARDENS: 1 x London Plane (Platanus x hispanica) (T85) - Reduce specified limb(s) - reducing the lowest limb to the east, suspected to be subsiding by around 2.5m, effectively crown lifting the tip of the limb to 4.5m, to reduce loading and extension over the footpath and minimise the potential for limb failure onto footpath. 1 x London Plane (Platanus x hispanica) (T86) - Reduce specified limb(s) - reducing the suspected subsiding, extended limbs to the south at 13m and to the east at 14m, over footpaths and lawn, to reduce loading and extension over the footpath and minimise the potential for limb failure. 1 x Holly (Ilex aquifolium) (T109) - Prune from adjacent structure to clear lamp column by 1m. 3 x London Planes (Platanus x hispanica) (T92, T95 & T84) - Prune from adjacent structure to clear lamp column by 1.5m.
- Pending2026/4884/TON STREET SIDE OF 22 BLOOMSBURY PLACE: 1 x Rowan (Sorbus aucuparia 'Asplenifolia) (T22) - Lift low canopy, highways clearance to 5.5m over road. 1 x Cotoneaster sp. (T23) - Lift low canopy, pedestrian clearance to 3m over footpath.
- Pending2026/4886/TREAR GARDEN: 1 x Tree of Heaven (Ailanthus altissima (T25) - Pollard. Pruning to remove approx. 5m in height and up to 2m in radial spread (balancing the crown structure), leaving the finishing height at around 13m to be managed as a pollard with cyclical reduction.
Ownership
- Corporate Ownership11.1%
- Overseas OwnershipNo
- Lease Term Remaining-
- CovenantsNone
- Lease Type-
- Last Ownership Change-
- SourceLand Registry
Connectivity
Broadband (-)
-
Mobile 4G/5G Coverage
-
EV Charger
-
PTAL Rating
-
Area Profile
Median EarningsLocal authority£44,088
Population Density-
Owner Occupied31%
Age Distribution
0-15 7%16-64 80%65+ 13%
Schools Nearby
- Inspected by ISIJeannine Manuel School0.1 mi
- -London School of Hygiene & Tropical Medicine0.2 mi
- -Birkbeck College0.3 mi
- All Souls CofE Primary School0.3 miArea grades2025
Inspected after Ofsted withdrew the single overall grade.
0 of 3 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.