Flat 302, Furlong Court, 6 St Pauls Way, London, E3 4YL

HP Score
- Verdict: INVESTIGATE, on a scale of Buy, Investigate, Avoid.
Strong fundamentals; flood risk not assessed
Verdict
Derived from HomePortfolio scores
Flat 302 earns an INVESTIGATE rating with HP Score 75/100. Investment score 76/100 reflects strong fundamentals. Crime intensity is moderate. Walkability is excellent (90/100). Flood risk is not assessed: check the Environment Agency long-term flood map before offering. Tenure is feudal. Every figure here comes from the live HomePortfolio API; anything it does not publish is left out.
Valuation & Market
Risk Overview
- Flood RiskUnknown
- SubsidenceSignificant
- RadonLow
- MiningUnknown
- LandslideLow
- Air QualityLow
- NoiseHigh
Planning Activity
- PendingPA/26/01608/NCMinor-Material Amendment to Planning Permission ref: PA/25/01705, dated 05/12/2025. Amendment(s) Sought: To vary condition no.2 (approved drawing list).
- PendingPA/26/01783/SApplication for non-material amendment of planning permission dated 11/08/25 , ref: PA/24/00996 The Non Material Amendment(s) Sought are to the consented landscape strategy and play space provision within Phase 2 of the Bow Common development. The following provides a summary of these amendments: ? New under 5's playspace provision introduced in the Ginnel Area; ? Additional 5-11s play provision within the Ginnel which will provide a greater variety in play setting across the development; ? Partial relocation of playspace from the Phase 3 podium ; ? Adjustments to pathways and landscape to reduce potential conflicts between movement and play; ? An enhanced relationship between play and the Pavilion café enabling parental supervision and natural surveillance within the Ginnel; and ? Integrated landscape and play design, combining planting, natural features and play elements.
- PendingPA/26/01783Application for non-material amendment of planning permission dated 11/08/25 , ref: PA/24/00996 The Non Material Amendment(s) Sought are to the consented landscape strategy and play space provision within Phase 2 of the Bow Common development. The following provides a summary of these amendments: ? New under 5's playspace provision introduced in the Ginnel Area; ? Additional 5-11s play provision within the Ginnel which will provide a greater variety in play setting across the development; ? Partial relocation of playspace from the Phase 3 podium ; ? Adjustments to pathways and landscape to reduce potential conflicts between movement and play; ? An enhanced relationship between play and the Pavilion café enabling parental supervision and natural surveillance within the Ginnel; and ? Integrated landscape and play design, combining planting, natural features and play elements.
Ownership
- Corporate Ownership28.4%
- Overseas OwnershipNo
- Lease Term Remaining999+ yrs
- CovenantsNone
- Lease TypeFeudal
- Last Ownership Change2018-12-20
- SourceLand Registry
Connectivity
Area Profile
Schools Nearby
- -St Paul With St Luke CofE Primary Federation0.1 mi
- Stebon Primary School0.2 miOutstandingImproving
- Stepney Greencoat Church of England Primary School0.3 miGood
- St Paul's Way Trust School0.3 miGood
1 of 12 nearby schools with published figures were oversubscribed in 2026 - demand, not a catchment.
Comparables
- Furlong Court, 6 St Pauls Way-£465k-
- Furlong Court, 6 St Pauls Way-£355k-
- Furlong Court, 6 St Pauls Way-£605k-
- Furlong Court, 6 St Pauls Way-£555k-