50 West Street, Grange Villa, Chester le Street, DH2 3LW
Planning activity in DH2 3LW.
50 West Street has a Low development pressure profile: 0 planning applications recorded in DH2 3LW over the last 12 months, with a n/a approval rate. The 6 most recent applications are listed within 1 km.
8 signals driving the planning outlook
Recent Planning Applications
- PendingDM/26/01661/FPA29 Jun 2026314 m awayLand To The West Of Newbridge Banks (Twizell Burn) Grange Villa Durham
Installation of micro hydropower scheme (15kW) on north bank of Twizell Burn, including intake, pipeline, turbine shed and buried power cable to Grange Villa Community Enterprise
DurhamAuthority record - PendingDM/26/01630/FPA24 Jun 2026984 m away58 Edenfield West Pelton Stanley DH9 6SS
Retrospective replacement of existing timber boundary fencing with solid wall with render finish.
DurhamAuthority record - ApprovedCountyDurham/DM/25/00947/DRC03 Apr 2025921 m awaySite Of Former Jingling Gate Inn Twizell Lane West Pelton DH2 3LZ
Discharge of Condition 6 (Footway arrangements) pursuant to planning permission DM/24/02152/VOC.
- PendingCountyDurham/DM/25/00426/FPA13 Feb 2025944 m awayLand To South West Of Osborne Court Newfield DH2 2SZ
Proposed boundary wall to front (southeast) boundary and erection of timber storage compound adjacent to new dwelling.
DurhamAuthority record - PendingCountyDurham/DM/25/00352/FPA07 Feb 2025956 m awayThe Gables 1C Front Street Newfield Chester-le-Street DH2 2SL
Retrospective planning application for amendments to previous Planning Permission DM/20/03802/FPA : Revised proposed boundary wall treatment for the front (southeast) boundary. Omission of proposed peaked gable feature to rear (northwest) elevation.
DurhamAuthority record - ApprovedCountyDurham/DM/24/03388/CPO13 Dec 2024143 m away33 Front Street Grange Villa Chester-le-Street DH2 3LJ
Certificate of proposed use for the property from dwellinghouse (C3) to 6 bed multiple occupancy (C4)
Development Pressure
- 0 planning applications recorded in DH2 3LW in the last 12 months.
- No applications have been decided in that window, so there is no approval rate yet.